Gayler Construction on the Cover of Professional Remodeler Magazine Read the Article
Tag Archives: Insulation
San Ramon Project is Complete!!!
2/24 – Completion of San Ramon Project. Scope of Work Included: Remodeling the Master Bedroom & Bathroom, Laundry Room, Powder Bathroom, Dining Room Arbor, Kitchen Double Soffit, Family Room & Great Room. Adding a Whole New 2nd Story to the Home Which Included an Office, 4th Bedroom and Full Bathroom. Read More
Energy Efficiency One Step at a Time
Whether a customer is looking for a kitchen remodel, family room addition or rehab down to the studs, there is always an opportunity to build green into the project. Read More
EcoSeal, Insulation & Sheetrock
11/22 – 11/28 EcoSeal is Applied (EcoSeal is a sealant that forms an effective and continuous air barrier in the spaces and openings of your building envelope), Insulation Installed, and Sheetrock Hung.
Follow the work in progress! Go to Exterior Painting Begins & the Start of the Driveway Blog Next Week Read More
Heavy Duty Work on the Foundation and Flooring
9/19-9/23 Foundation is poured. Floor joists are started. Steel is laid out for garage slab. Insulation is added and the rough floor is built.
Follow the work in progress! Go to The Walls Start to go Up Blog Next Read More
Flooring, Framing and Still Fighting the Rain
3/15- Flooring, framing, insulation, rooms laid out, and the walls go up. Still battling the rain, but our PM, Jeff, is determined to work through it and keep on schedule
3/29- Plywood sheathing going up
Follow the work in progress! Go to Windows, Plumbing, Electrical, Sheet Rock and Priming Blog Next
Read More